Municipal Pipeline System / PE Solid Wall Repair Pipe

PE Solid-Wall Rehabilitation Pipe

PE solid-wall pipe products for the renewal, lining, repair and reconstruction of existing municipal drainage pipe networks.

Product Overview

Provides rehabilitation pipeline options for existing pipeline network updates

PE Solid-Wall Rehabilitation Pipe adopts polyethylene solid wall structure and is oriented to the renewal and repair of existing municipal drainage and sewage pipe networks. The pipe is corrosion-resistant, wear-resistant and flexible, and can be selected based on project construction conditions such as lining, traction, and jacking.

PEPolyethylene solid wall structure
Pipe network updateMunicipal Remediation Application
Selection on demandSpecification plan confirmation
PE Solid-Wall Rehabilitation Pipe

Product Features

PE Solid-Wall Rehabilitation Pipe

PE Solid-Wall Rehabilitation Pipe adopts polyethylene solid wall structure and is suitable for the renewal and repair of existing municipal drainage and sewage pipe networks. The product can match the corresponding pipe diameter, wall thickness and connection form based on the original pipe conditions, laying path and construction plan of the project.

  • Solid wall structure, suitable for renewal and lining renovation of existing drainage pipe network
  • Corrosion-resistant and wear-resistant, suitable for underground drainage and sewage discharge environments
  • Good flexibility, easy to match different construction paths
Product Type
Polyethylene solid wall repair pipe
Applicable direction
Municipal drainage and sewage pipe network renewal, repair and renovation
Product Features
Corrosion-resistant, wear-resistant, good flexibility
Selection instructions
The diameter, wall thickness, length and connection method are confirmed with the project plan
PE Solid-Wall Rehabilitation Pipe

Applications and Supporting

Make the repair plan more suitable for site conditions

It is suitable for the renewal, lining and repair of existing municipal drainage and sewage pipelines. It is recommended to clarify the original pipe condition, pipe diameter, laying length, construction method and node connection requirements during the project communication stage.

  • Confirm the adaptation plan based on the original pipeline conditions and traffic space
  • Confirm the connection method based on the construction technology and site node conditions
  • You can contact GENTAIN to communicate product specifications, technical information and project support
Back to PE Rehabilitation Pipes

Project Support

Match Product Selection to Project Conditions

If you need specification sheets, connection plans or project supply support, please communicate with GENTAIN about the specific application scenarios, pipe diameters, pressure levels and construction conditions.

Contact GENTAIN