Municipal Pipeline System / PE Wound Solid Wall Repair Pipe

PE Wound Solid-Wall Rehabilitation Pipe

A winding solid wall repair product for the renewal of existing municipal drainage pipe networks and complex construction conditions.

Product Overview

Provide repair pipeline options for complex working conditions

PE wound solid wall repair pipe adopts a solid wall pipe structure formed by polyethylene winding, and is oriented to the renewal and repair of existing municipal drainage and sewage pipe networks. The product can be combined with on-site traffic space, original pipe conditions and construction routes to match corresponding product specifications and implementation plans.

PEWrap solid wall structure
Complex working conditionsRepair and renovation application
Project adaptationSpecification plan confirmation
PE Wound Solid-Wall Rehabilitation Pipe

Product Features

PE Wound Solid-Wall Rehabilitation Pipe

PE Wound Solid-Wall Rehabilitation Pipes are designed for the renewal, repair and transformation of existing municipal drainage and sewage pipe networks. The winding forming process facilitates size matching according to project conditions and can be adapted to repair construction plans such as lining and traction.

  • Winding solid wall structure, suitable for pipe network renewal and trenchless repair and renovation
  • Corrosion-resistant, smooth inner wall, suitable for drainage and sewage transportation environment
  • Can be matched based on site space, original pipe conditions and construction path
Product Type
Polyethylene wrapped solid wall repair pipe
Applicable direction
Municipal drainage and sewage pipe network renewal, repair and renovation
Product Features
Corrosion-resistant, smooth inner wall, good construction adaptability
Selection instructions
The diameter, wall thickness, length and connection method are confirmed with the project plan
PE Wound Solid-Wall Rehabilitation Pipe

Applications and Supporting

Make the repair plan more suitable for site conditions

It is suitable for the renewal, lining and repair of existing municipal drainage and sewage pipelines. It is recommended to clarify the original pipe condition, pipe diameter, laying length, construction method and node connection requirements during the project communication stage.

  • Confirm the adaptation plan based on the original pipeline conditions and traffic space
  • Confirm the connection method based on the construction technology and site node conditions
  • You can contact GENTAIN to communicate product specifications, technical information and project support
Back to PE Rehabilitation Pipes

Project Support

Match Product Selection to Project Conditions

If you need specification sheets, connection plans or project supply support, please communicate with GENTAIN about the specific application scenarios, pipe diameters, pressure levels and construction conditions.

Contact GENTAIN